Warehouse management: optimizing procurement and reducing stock and shortages

Case Study: optimizing procurement to reduce stock, avoid shortages, and improve material management in production.

  • Automotive
  • Logistics
Grafica astratta con tre icone circolari illuminate disposte in fila orizzontale, rappresentante i case study.
The Context

Unstructured warehouse management

The reason the client contacted us was that they had a set of approximately 3,000 SKUs in the warehouse, managed visually by operators. This system generated significant issues: production shortages, overstocking caused by incorrect planning, and a high number of inefficiently generated orders. Our goal in this project was clear: to define and implement an effective procurement policy capable of resolving existing criticalities, improving production logistics, and material control.

The Project

Defining an effective procurement management model

The project introduced structured logic for material management, improving the balance between stock, shortages, and operational activities.

  • Client Industry

    Company active in the automotive sector, with approximately 3,000 SKUs managed in the warehouse and a need to improve material management.

  • Initial Situation

    Procurement based on experience and visual logic, without a structured planning system.

  • Critical Issues Identified

    Excess stock and frequent material shortages, with impacts on production and costs.

  • Project Objectives

    Defining effective policies to improve material control and production continuity.

Solution

Definition of procurement policies and parameters

We intervened with a structured approach, starting from the analysis of consumption and the characteristics of the materials managed in the warehouse. Based on these analyses, we defined specific procurement policies, distinguishing between requirement-based management and controlled stock management. For stock-managed SKUs, we introduced parameters such as procurement lot, safety stock, and reorder point. The identified solutions were validated through a simulator we developed, which allowed for the evaluation of different scenarios in terms of stock levels, shortage frequency, and number of orders. Once the optimal configuration was identified, we implemented the parameters within the company’s management system, making the model operational and integrated into the processes.

Project Phases

Analysis, policy definition, implementation

The project developed through data analysis, the definition of procurement policies, and the implementation of parameters in the management system.

Step 1

Analysis

Consumption study

Analysis of consumption and material characteristics to define management logic.

Step 2

Definition

Management policies

Introduction of requirement-based and stock-based management with specific logistical parameters.

Step 3

Implementation

System parameters

Configuration of parameters in the management system and launch of the new operating model.


Results

Stock reduction and guaranteed material availability

The project improved warehouse management, allowing for a reduction in stock levels and ensuring material availability without increasing operational effort.

Outputs Obtained

Project Deliverables

-20% stock

Reduction in the total value of inventory, thanks to optimized procurement policies.

Zero shortages

Elimination of material shortages, even during periods of peak demand.

Unchanged effort

The operational workload of the purchasing department remained unchanged, despite a significant improvement in performance.

Greater control

More structured material management and greater visibility into procurement dynamics.

Do You Have a Similar Challenge?

Optimize your warehouse management and reduce floor stock and shortages with a concrete project based on data and structured processes.
Makeitalia S.r.l. a Socio Unico
Via Jan Palach, 55 41122 Modena
VAT No: 03213690369
Company Register: MO – 368378

Makeitalia © 2026 | All Rights Reserved | Cookie Policy | Privacy Policy | Video Surveillance Privacy | Organizational Model 231