{"id":6257,"date":"2026-10-22T14:40:03","date_gmt":"2026-10-22T12:40:03","guid":{"rendered":"https:\/\/www.makeitalia.com\/case-studies\/cost-engineering-piu-controllo-sui-costi-e-negoziazioni-efficaci\/"},"modified":"2026-10-23T11:27:33","modified_gmt":"2026-10-23T09:27:33","slug":"cost-engineering-improved-cost-control-and-more-effective-negotiations","status":"publish","type":"case-study","link":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/","title":{"rendered":"Cost Engineering: improved cost control and more effective negotiations"},"content":{"rendered":"<h1>\n<p>Cost Engineering: improved cost control and more effective negotiations<\/p>\n<\/h1>\n<div>\n<p>Case Study: a project that enabled our client to understand the cost drivers behind its supply base, identify savings opportunities, and support negotiations with objective data.<\/p>\n<\/div>\n<ul>\n<li>\n<div>Logistics<\/div>\n<\/li>\n<li>\n<div>Purchasing<\/div>\n<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\" alt=\"Grafica astratta con tre icone circolari illuminate disposte in fila orizzontale, rappresentante i case study.\"><\/p>\n<div>The Context<\/div>\n<h2>Negotiating without knowing the true costs<\/h2>\n<div>\n<p>When purchasing highly complex supplies, knowing the price is not enough. It is essential to understand what lies behind that price. This is a common challenge for many companies: strategic components, suppliers with highly specialized expertise, custom-engineered solutions, and limited visibility into the actual cost structure.<\/p>\n<p>In the case of our client, a company operating in the industrial plant engineering sector, the objective was to reduce costs on several strategic supplies with a significant impact on overall project costs, while at the same time gaining a deeper understanding of what was being purchased.<\/p>\n<p>The company had access to commercial quotations from its suppliers but lacked a clear view of the factors and mechanisms that determined the final price of the supplies. As a result, it was more difficult to assess whether the quotations were economically justified and to approach negotiations with full confidence and awareness.<\/p>\n<\/div>\n<div>The Project<\/div>\n<h2>Greater cost control and more effective negotiations<\/h2>\n<div>\n<p>The Cost Engineering project made it possible to gain a detailed understanding of the cost structure of strategic supplies, identify savings opportunities, and equip the procurement team with a tool that can be used over time to support decision-making and negotiations.<\/p>\n<\/div>\n<ul>\n<li>\n<h3>Client Industry<\/h3>\n<div>A company operating in the industrial plant engineering sector.<\/div>\n<\/li>\n<li>\n<h3>Initial situation<\/h3>\n<div>Limited visibility into the cost components driving the final price of certain business-critical supplies.<\/div>\n<\/li>\n<li>\n<h3>Critical issues identified<\/h3>\n<div>Difficulty in assessing the economic validity of supplier quotations and conducting negotiations supported by objective cost data.<\/div>\n<\/li>\n<li>\n<h3>Project objectives<\/h3>\n<div>Understand the cost structure of supplies, identify cost-saving opportunities, and strengthen the procurement team&#8217;s negotiation capabilities.<\/div>\n<\/li>\n<\/ul>\n<div>Solution<\/div>\n<h2>Cost Engineering and costing model<\/h2>\n<div>\n<p>To address the challenge, we adopted a Cost Engineering approach aimed at breaking down the price of supplies into its fundamental components and developing a cost model capable of explaining how the cost of a complex solution is generated.<\/p>\n<p>Starting with a number of pilot projects, we analyzed the main elements contributing to the final price, including raw materials, manufacturing processes, engineering activities, transportation, and factors related to the complexity of delivering the supplies.<\/p>\n<p>Given the limited availability of data, we launched a structured data collection and validation process involving both the client and its suppliers. The pilot projects enabled us to verify the reliability of the methodology and develop a calculation logic aligned with the specific characteristics of the client&#8217;s business.<\/p>\n<p>Once the costing model had been completed, we developed a dedicated tool capable of incorporating all the information collected and the know-how generated throughout the project. The tool enables the simulation of different scenarios and the creation of a customized costed Bill of Materials (BOM) tailored to each individual project and supplier.<\/p>\n<\/div>\n<div>Project Phases<\/div>\n<h2>From cost analysis to decision support<\/h2>\n<div>\n<p>The project was carried out through a series of activities including supply analysis, the development of a costing model, and the creation of a tool to support procurement decision-making.<\/p>\n<\/div>\n<ul>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/1-di-3.svg\" alt=\"\"><\/p>\n<h3>Step 1<\/h3>\n<p>Analysis<\/p>\n<div>\n<h3 class=\"esc-step-title\">Cost Engineering<\/h3>\n<p>Analysis of pilot projects and the cost components contributing to the final price of supplies.<\/p>\n<\/div>\n<p><a href=\"#\"><\/a><\/p>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/2-di-3.svg\" alt=\"\"><\/p>\n<h3>Step 2<\/h3>\n<p>Validation<\/p>\n<div>\n<h3 class=\"esc-step-title\">Costing Model<\/h3>\n<p>Data collection and validation, development of the calculation logic, and verification of the model\u2019s reliability.<\/p>\n<\/div>\n<p><a href=\"#\"><\/a><\/p>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/07\/3-di-3.svg\" alt=\"\"><\/p>\n<h3>Step 3<\/h3>\n<p>Implementation<\/p>\n<div>\n<h3 class=\"esc-step-title\">Purchasing support tool<\/h3>\n<p>Development of a tool to simulate scenarios, calculate supply costs, and support negotiations with objective data.<\/p>\n<\/div>\n<p><a href=\"#\"><\/a><\/p>\n<\/li>\n<\/ul>\n<hr>\n<div>Results<\/div>\n<h2>Greater cost control and more informed negotiations<\/h2>\n<div>The project enabled the company to identify cost-saving opportunities, increase transparency into the cost structure of its supplies, and support decision-making through a tool designed for long-term use. The company now benefits from greater confidence during negotiations and a structured methodology for evaluating its strategic supplies.<\/div>\n<div>Outputs obtained<\/div>\n<h2>Project deliverables<\/h2>\n<ul>\n<li>\n<h3>14% potential cost savings<\/h3>\n<div>Identification of potential cost-saving opportunities of approximately 14% compared to the costs incurred for the projects analyzed.<\/div>\n<\/li>\n<li>\n<h3>Structured costing model<\/h3>\n<div>Creation of a model capable of explaining and analyzing the cost structure of complex supplies.<\/div>\n<\/li>\n<li>\n<h3>Purchasing decision-making tool<\/h3>\n<div>Dedicated tool to simulate scenarios, compare suppliers, and support negotiations with measurable data.<\/div>\n<\/li>\n<li>\n<h3>Greater transparency with suppliers<\/h3>\n<div>Involving suppliers in negotiations based on a detailed and transparent cost breakdown, fostering more technical and objective discussions.<\/div>\n<\/li>\n<\/ul>\n<div>Related case studies<\/div>\n<h2>Discover other projects<\/h2>\n<div>\n<\/div>\n<h2>Do You Have a similar challenge?<\/h2>\n<div>Understand your costs, identify saving opportunities and strengthen your negotiating power through Cost Engineering.<\/div>\n<p><p>\n        <a href=\"https:\/\/www.makeitalia.com\/en\/contact-us\/\">CONTACT US<\/a>\n    <\/p>\n<\/p>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"2-3,1-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"\n\n<p>Cost Engineering: improved cost control and more effective negotiations<\/p>\n\n\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h1\",\"title_style\":\"heading-xlarge\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left-large\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Case Study: a project that enabled our client to understand the cost drivers behind its supply base, identify savings opportunities, and support negotiations with objective data.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"maxwidth\":\"2xlarge\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"bottom\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"list\",\"props\":{\"class\":\" esc-chips esc-text-padding-left\",\"column_breakpoint\":\"m\",\"image_align\":\"left\",\"image_svg_color\":\"emphasis\",\"image_vertical_align\":true,\"list_element\":\"ul\",\"list_horizontal_separator\":\", \",\"list_type\":\"vertical\",\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"list_item\",\"props\":{\"content\":\"Logistics\"}},{\"type\":\"list_item\",\"props\":{\"content\":\"Purchasing\"}}],\"name\":\"chips case \"}]}]}],\"name\":\"06 ESC Section Intro\"},{\"type\":\"section\",\"props\":{\"class\":\"esc-section-hero-image\",\"height\":\"pixels\",\"image_position\":\"center-center\",\"image_size\":\"cover\",\"padding_bottom\":\"none\",\"padding_top\":\"xsmall\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"image\",\"props\":{\"css\":\".el-image{\\n    width: 100%\\n}\",\"height_expand\":true,\"image\":\"wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\",\"image_alt\":\"Grafica astratta con tre icone circolari illuminate disposte in fila orizzontale, rappresentante i case study.\",\"image_svg_color\":\"emphasis\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]}],\"name\":\"Sezione imagine\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"The Context\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Negotiating without knowing the true costs\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>When purchasing highly complex supplies, knowing the price is not enough. It is essential to understand what lies behind that price. This is a common challenge for many companies: strategic components, suppliers with highly specialized expertise, custom-engineered solutions, and limited visibility into the actual cost structure.\\n\\nIn the case of our client, a company operating in the industrial plant engineering sector, the objective was to reduce costs on several strategic supplies with a significant impact on overall project costs, while at the same time gaining a deeper understanding of what was being purchased.\\n\\nThe company had access to commercial quotations from its suppliers but lacked a clear view of the factors and mechanisms that determined the final price of the supplies. As a result, it was more difficult to assess whether the quotations were economically justified and to approach negotiations with full confidence and awareness.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]}],\"name\":\"06 ESC Section Intro\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"muted\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"The Project\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Greater cost control and more effective negotiations\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>The Cost Engineering project made it possible to gain a detailed understanding of the cost structure of strategic supplies, identify savings opportunities, and equip the procurement team with a tool that can be used over time to support decision-making and negotiations.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]},{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"}},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"name\":\"Description List Meta Below Title\",\"type\":\"description_list\",\"children\":[{\"type\":\"description_list_item\",\"props\":{\"content\":\"A company operating in the industrial plant engineering sector.\",\"meta\":\"\",\"title\":\"Client Industry\"}},{\"type\":\"description_list_item\",\"props\":{\"content\":\"Limited visibility into the cost components driving the final price of certain business-critical supplies.\",\"meta\":\"\",\"title\":\"Initial situation\"}},{\"type\":\"description_list_item\",\"props\":{\"content\":\"Difficulty in assessing the economic validity of supplier quotations and conducting negotiations supported by objective cost data.\",\"meta\":\"\",\"title\":\"Critical issues identified\"}},{\"type\":\"description_list_item\",\"props\":{\"content\":\"Understand the cost structure of supplies, identify cost-saving opportunities, and strengthen the procurement team's negotiation capabilities.\",\"meta\":\"\",\"title\":\"Project objectives\"}}],\"props\":{\"block_align\":\"center\",\"column_breakpoint\":\"m\",\"layout\":\"grid-2\",\"list_element\":\"ul\",\"list_style\":\"divider\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_style\":\"text-meta\",\"show_content\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"title_colon\":false,\"title_element\":\"h3\",\"title_font_family\":\"secondary\",\"title_grid_breakpoint\":\"m\",\"title_grid_column_gap\":\"large\",\"title_grid_row_gap\":\"large\",\"title_grid_width\":\"medium\",\"title_style\":\"heading-small\"}}]}]}],\"name\":\"24  ESC Section intro +  Feature List  (senza media)\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"Solution\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Cost Engineering and costing model\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>To address the challenge, we adopted a Cost Engineering approach aimed at breaking down the price of supplies into its fundamental components and developing a cost model capable of explaining how the cost of a complex solution is generated.\\n\\nStarting with a number of pilot projects, we analyzed the main elements contributing to the final price, including raw materials, manufacturing processes, engineering activities, transportation, and factors related to the complexity of delivering the supplies.\\n\\nGiven the limited availability of data, we launched a structured data collection and validation process involving both the client and its suppliers. The pilot projects enabled us to verify the reliability of the methodology and develop a calculation logic aligned with the specific characteristics of the client's business.\\n\\nOnce the costing model had been completed, we developed a dedicated tool capable of incorporating all the information collected and the know-how generated throughout the project. The tool enables the simulation of different scenarios and the creation of a customized costed Bill of Materials (BOM) tailored to each individual project and supplier.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]}],\"name\":\"06 ESC Section Intro\"},{\"name\":\"09 ESC  SECTION INTRO + GRID CARD (STEP) \",\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"secondary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"Project Phases\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"From cost analysis to decision support\",\"heading_element\":\"h2\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"margin_bottom\":\"large\",\"margin_top\":\"default\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left\",\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>The project was carried out through a series of activities including supply analysis, the development of a costing model, and the creation of a tool to support procurement decision-making.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}],\"props\":{\"layout\":\"1-3,2-3\"}},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"name\":\"Grid Parallax\",\"type\":\"grid\",\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<h3 class=\\\"esc-step-title\\\">Cost Engineering<\/h3>\n\n\\n\n\n<p>Analysis of pilot projects and the cost components contributing to the final price of supplies.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/07\/1-di-3.svg\",\"link\":\"#\",\"meta\":\"Analysis\",\"title\":\"Step 1\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<h3 class=\\\"esc-step-title\\\">Costing Model<\/h3>\n\n\\n\n\n<p>Data collection and validation, development of the calculation logic, and verification of the model\u2019s reliability.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/07\/2-di-3.svg\",\"link\":\"#\",\"meta\":\"Validation\",\"title\":\"Step 2\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<h3 class=\\\"esc-step-title\\\">Purchasing support tool<\/h3>\n\n\\n\n\n<p>Development of a tool to simulate scenarios, calculate supply costs, and support negotiations with objective data.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/07\/3-di-3.svg\",\"link\":\"#\",\"meta\":\"Implementation\",\"title\":\"Step 3\"}}],\"props\":{\"blend\":false,\"class\":\"esc-step\",\"content_column_breakpoint\":\"m\",\"content_margin\":\"small\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_column_gap\":\"collapse\",\"grid_default\":\"1\",\"grid_medium\":\"3\",\"grid_row_gap\":\"collapse\",\"grid_small\":\"2\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_animate\":false,\"image_svg_color\":\"primary\",\"image_svg_inline\":false,\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"text\",\"link_text\":\"\",\"margin_bottom\":\"large\",\"margin_top\":\"large\",\"meta_align\":\"below-title\",\"meta_color\":\"danger\",\"meta_element\":\"div\",\"meta_margin\":\"medium\",\"meta_margin_auto\":false,\"meta_style\":\"text-meta\",\"panel_padding\":\"default\",\"panel_style\":\"card-default\",\"parallax_breakpoint\":\"m\",\"parallax_easing\":\"1\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"title_align\":\"top\",\"title_color\":\"muted\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_margin\":\"xsmall\",\"title_margin_auto\":false}}]}],\"props\":{\"row_gap\":\"large\"}},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"name\":\"Divider Style Default\",\"type\":\"divider\",\"props\":{\"divider_element\":\"hr\"}}]}]}]},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"Results\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Greater cost control and more informed negotiations\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"class\":\"esc-text-padding-left\",\"column_breakpoint\":\"m\",\"content\":\"The project enabled the company to identify cost-saving opportunities, increase transparency into the cost structure of its supplies, and support decision-making through a tool designed for long-term use. The company now benefits from greater confidence during negotiations and a structured methodology for evaluating its strategic supplies.\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]}],\"name\":\"06 ESC Section Intro\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"Outputs obtained\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Project deliverables\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"accordion\",\"props\":{\"class\":\"esc-faq-accordion  esc-text-padding-left\",\"collapsible\":false,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"accordion_item\",\"props\":{\"content\":\"Identification of potential cost-saving opportunities of approximately 14% compared to the costs incurred for the projects analyzed.\",\"title\":\"14% potential cost savings\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"Creation of a model capable of explaining and analyzing the cost structure of complex supplies.\",\"title\":\"Structured costing model\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"Dedicated tool to simulate scenarios, compare suppliers, and support negotiations with measurable data.\",\"title\":\"Purchasing decision-making tool\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"Involving suppliers in negotiations based on a detailed and transparent cost breakdown, fostering more technical and objective discussions.\",\"title\":\"Greater transparency with suppliers\"}}]}]}]}],\"name\":\"14 ESC Faq \"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"primary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"large\",\"layout\":\"1-3,2-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"esc-custom-title-line\",\"content\":\"Related case studies\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"text-meta\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Discover other projects\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}}]}]},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"grid\",\"props\":{\"class\":\"esc-grid-case-studies\",\"content_column_breakpoint\":\"m\",\"content_margin\":\"remove\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_medium\":\"3\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"text\",\"link_text\":\"Read more\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_margin_auto\":false,\"meta_style\":\"text-meta\",\"panel_link\":true,\"panel_padding\":\"default\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"text-lead\"},\"children\":[{\"type\":\"grid_item\",\"source\":{\"query\":{\"name\":\"caseStudys.customCaseStudy\",\"arguments\":{\"id\":4933}},\"props\":{\"title\":{\"arguments\":[],\"name\":\"field.titolo_preview\"},\"meta\":{\"arguments\":[],\"name\":\"field.settore\"},\"content\":{\"arguments\":[],\"name\":\"field.area\"},\"image\":{\"arguments\":[],\"name\":\"featuredImage.url\"},\"link\":{\"arguments\":[],\"name\":\"link\"}}},\"props\":{\"link_text\":\"Scopri il case study\"}}]}]}]}],\"name\":\"--- GRIGLIA CS t\"},{\"type\":\"section\",\"props\":{\"class\":\"esc-section-red\",\"image_position\":\"center-center\",\"style\":\"primary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"layout\":\"2-3,1-3\",\"row_gap\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"2-3\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Do You Have a similar challenge?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"heading-large\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"Understand your costs, identify saving opportunities and strengthen your negotiating power through Cost Engineering.\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"bottom\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"text_align\":\"right\",\"text_align_breakpoint\":\"m\",\"text_align_fallback\":\"left\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"primary\",\"content\":\"CONTACT US\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon\":\"arrow-right\",\"icon_align\":\"right\",\"link\":\"https:\/\/www.makeitalia.com\/en\/contact-us\/\"}}]}]}]}],\"name\":\"12 ESC Cta banner (type 2)\"}],\"version\":\"5.0.51\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cost Engineering: improved cost control and more effective negotiations Case Study: a project that enabled our client to understand the cost drivers behind its supply base, identify savings opportunities, and support negotiations with objective data. Logistics Purchasing The Context Negotiating without knowing the true costs When purchasing highly complex supplies, knowing the price is not [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":4934,"template":"","class_list":["post-6257","case-study","type-case-study","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cost Engineering: cost control and effective negotiations<\/title>\n<meta name=\"description\" content=\"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cost Engineering: cost control and effective negotiations\" \/>\n<meta property=\"og:description\" content=\"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/\" \/>\n<meta property=\"og:site_name\" content=\"Makeitalia\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T09:27:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.makeitalia.com\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1081\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/\",\"url\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/\",\"name\":\"Cost Engineering: cost control and effective negotiations\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.makeitalia.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\",\"datePublished\":\"2026-10-22T12:40:03+00:00\",\"dateModified\":\"2026-10-23T09:27:33+00:00\",\"description\":\"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.makeitalia.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\",\"contentUrl\":\"https:\\\/\\\/www.makeitalia.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg\",\"width\":1920,\"height\":1081,\"caption\":\"makeitalia case study, supply chain\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/cost-engineering-improved-cost-control-and-more-effective-negotiations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\\\/\\\/www.makeitalia.com\\\/en\\\/case-studies\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cost Engineering: improved cost control and more effective negotiations\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cost Engineering: cost control and effective negotiations","description":"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/","og_locale":"en_US","og_type":"article","og_title":"Cost Engineering: cost control and effective negotiations","og_description":"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.","og_url":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/","og_site_name":"Makeitalia","article_modified_time":"2026-10-23T09:27:33+00:00","og_image":[{"width":1920,"height":1081,"url":"https:\/\/www.makeitalia.com\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/","url":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/","name":"Cost Engineering: cost control and effective negotiations","isPartOf":{"@id":"https:\/\/www.makeitalia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/#primaryimage"},"image":{"@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.makeitalia.com\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg","datePublished":"2026-10-22T12:40:03+00:00","dateModified":"2026-10-23T09:27:33+00:00","description":"A Cost Engineering project enabled a company to achieve greater cost transparency, cost savings, and more effective negotiations.","breadcrumb":{"@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/#primaryimage","url":"https:\/\/www.makeitalia.com\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg","contentUrl":"https:\/\/www.makeitalia.com\/wp-content\/uploads\/2026\/09\/Case-study-sia-pagina-generale-sia-in-tutti-i-case-study-specifici-1.jpeg","width":1920,"height":1081,"caption":"makeitalia case study, supply chain"},{"@type":"BreadcrumbList","@id":"https:\/\/www.makeitalia.com\/en\/case-studies\/cost-engineering-improved-cost-control-and-more-effective-negotiations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.makeitalia.com\/en\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/www.makeitalia.com\/en\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Cost Engineering: improved cost control and more effective negotiations"}]}]}},"_links":{"self":[{"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/case-study\/6257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/case-study"}],"about":[{"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/types\/case-study"}],"author":[{"embeddable":true,"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":44,"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/case-study\/6257\/revisions"}],"predecessor-version":[{"id":6330,"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/case-study\/6257\/revisions\/6330"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/media\/4934"}],"wp:attachment":[{"href":"https:\/\/www.makeitalia.com\/en\/wp-json\/wp\/v2\/media?parent=6257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}